The project
![](/img/containers/assets/projects/compressed_images/195a9431-%281%29.jpg/7fa2c4c446ead02d998442301063d3f0.jpg)
Design
Fulton Hogan, who was contracted by Christchurch City Council, came to us with the plans for the historic shelters. Our design team took these as a base and created specific CAD drawings for the construction, so components were optimised for the manufacturing process.
![](/img/containers/assets/projects/compressed_images/195a9428-%281%29.jpg/c43de2bba84343795790a56c4d532938.jpg)
Manufacturing process
All elements of the tram shelter construction were manufactured by ENI, including the sign on top and the bench inside.
This project is a good example of how we can accommodate low-volume production of unique pieces. With our broad spectrum of capabilities, from metal fabrication through to powder coating, we can cover all aspects of the manufacturing process.
![](/img/containers/assets/projects/compressed_images/195a9417_1-%281%29.jpg/03ba11ebedbf943845567a657a55d00a.jpg)
Installation
After all components of the construction were manufactured and assembled, we delivered them to the work site and Fulton Hogan handled the installation.