The project
Design
Fulton Hogan, who was contracted by Christchurch City Council, came to us with the plans for the historic shelters. Our design team took these as a base and created specific CAD drawings for the construction, so components were optimised for the manufacturing process.
Manufacturing process
All elements of the tram shelter construction were manufactured by ENI, including the sign on top and the bench inside.
This project is a good example of how we can accommodate low-volume production of unique pieces. With our broad spectrum of capabilities, from metal fabrication through to powder coating, we can cover all aspects of the manufacturing process.
Installation
After all components of the construction were manufactured and assembled, we delivered them to the work site and Fulton Hogan handled the installation.